501.960.8971
Heating and Cooling Repair and Maintenance

Terms and Conditions

Effective date: October 1, 2026


1. Scope, documents, and authority

These Terms apply to services, diagnostics, repairs, installations, replacement equipment, construction projects, and preventive maintenance plans performed by Yates Maintenance, LLC ("Yates") for the customer or authorized contracting party ("Customer"). The accepted written proposal, scope, approved change orders, applicable service-plan schedule, and these Terms form the agreement. A project-specific signed agreement controls over conflicting general language to the extent expressly stated. No oral representation changes the agreement; modifications require written authorization by Yates and Customer. Technicians cannot expand warranties or approve unpriced scope changes. For commercial and new-construction bids, final proposal submission and modifications require owner authorization.

2. Customer authorization and contact information

The responsible paying party must be at least 18 and present for appointments unless Yates approves another arrangement in writing. A person approving work represents that they have authority to authorize work and payment. Yates Maintenance will not switch the invoice into someone else's name, or send an invoice to someone else to pay. The customer who approved work must pay at time of service. Customer must provide accurate contact and billing information, safe access, working utilities, clear paths to equipment, and permission to start/stop equipment as needed. Yates may communicate appointment notices, estimates, invoices, and work-related updates by telephone, email, or text to supplied contacts, subject to applicable consent and opt-out laws. Marketing communications require any separate consent required by law.

3. Rental properties and tenant access

For rental and multi-property accounts, the owner or authorized manager is responsible for tenant access, timely approvals, and payment. Tenant scheduling and forwarding of notifications are the owner/manager's responsibility unless separately contracted in writing. Customer is responsible for missed visits caused by inaccessible premises, unrestrained animals, locked gates, or unavailable authorized contacts.

4. Scheduling, arrival windows, and missed appointments

Service may be scheduled at 501-960-8971 or www.yatesmaintenance.com. A valid card on file may be required before dispatch. Calls are generally scheduled first-come, first-served; emergencies and severe-weather conditions may require reasonable rescheduling. Technician arrival windows are estimated at three hours; Yates will always attempt to provide en-route notification. Should the customer need to cancel, they should cancel as soon as possible, preferably at least one hour before the scheduled arrival. If the technician arrives and access or an authorized contact is unavailable, Yates may wait up to 15 minutes and assess the applicable standard trip fee ($99.00 residential or $139.00 commercial, plus applicable tax), to cover gas and drive time. Scheduling windows are estimates, not guarantees. Yates Maintenance will make every effort to be prompt in the window of arrival, but can not guarantee a prior service call length of time for repair.

5. Business hours and standard trip fees

Normal service business hours: Monday-Friday, 8:00 a.m.-4:00 p.m. Standard residential trip/diagnostic fee: $99.00 plus applicable tax per system evaluated. Standard commercial trip/diagnostic fee: $139.00 plus applicable tax per system evaluated. The standard trip fee covers dispatch and initial diagnostic evaluation; it is one charge, not a separate trip fee added to the diagnostic fee for the same standard visit.

6. After-hours trip fees and additional charges

Residential after-hours trip/diagnostic fee: $179.00 plus applicable tax (4:00-10:00 p.m.); commercial after-hours trip/diagnostic fee: $259.00 plus applicable tax. After-hours rates apply based on technician arrival time for service after 4:00 p.m., weekends, and recognized holidays. Repairs, materials, additional labor, and specialized testing are separately quoted or authorized. Applicable charges for missed appointments or inaccessible sites are addressed in Section 3.

7. Estimates, scope, and change orders

Estimates for qualifying replacement systems may be offered without charge. Written estimates are valid for 15 days unless stated otherwise. Comparisons to competing estimates require materially comparable specifications. Only the labor, equipment, materials, permits, tests, and services expressly included in the accepted proposal are included in the price. Work outside the approved scope-including unforeseen conditions, customer-requested changes, additional trips, modifications by others, and code upgrades not included-requires a written change order describing price and, where applicable, schedule impact. Yates Maintenance will not perform additional work until approved. No change order may authorize unsafe or unlawful work.

8. Service diagnostics, repair approvals, and declined recommendations

A diagnostic is an assessment of conditions reasonably observable or testable at the time of inspection; intermittent faults, concealed defects, and additional failures may remain undiscovered. A repair addresses the specifically diagnosed condition and is not a promise that an older or partially repaired system is free of other defects. Customer may decline recommended repairs, testing, or replacement; Yates Maintenance may document the refusal and advise against operating unsafe equipment. Yates Maintenance is not responsible for subsequent losses caused by a declined recommendation to the extent not caused by Yates Maintenance's own acts or omissions. Safety-related work may be suspended or declined.

9. Customer-supplied equipment and parts

Yates Maintenance, LLC does not install customer-supplied HVAC equipment, replacement parts, components, or accessories. All parts and equipment installed by Yates must be supplied by Yates through its approved manufacturers, distributors, or suppliers. This policy applies to residential and commercial service, repairs, replacements, remodels, new installations, and new construction. Customer-provided items, including items purchased online or furnished by a homeowner, property owner, tenant, general contractor, or other third party, will not be installed. This requirement protects equipment compatibility, quality control, and access to manufacturer and distributor warranty support; manufacturer warranty availability varies by product and supplier.

10. Electrical safety and third-party modifications

Customers must not handle HVAC electrical components; disconnecting a breaker alone does not establish safe de-energization. Yates Maintenance is not responsible for damage caused by unauthorized modifications or work performed by others, but third-party work does not automatically void unrelated warranty rights or coverage. Any deviation from this no-installation policy requires prior written approval by Yates Maintenance ownership in a separately signed agreement; Yates Maintenance has no obligation to approve an exception.

11. Refrigerant and leak searches

A leak search may identify one or more leaks but does not guarantee discovery of every leak. Refrigerant can escape from other existing or subsequently developing leaks. Refrigerant, repeated searches, and separate repairs may be billed when not covered by an applicable warranty. Yates Maintenance will handle refrigerant in accordance with applicable EPA Section 608 requirements and may decline recharge where prohibited or unsafe. Yates Maintenance warrants its actual repair workmanship only as provided in the applicable written warranty; this is not a guarantee against all future leaks.

12. Drain cleaning and discounted return visit

Cleaning a heavily soiled evaporator coil or condensate drain can loosen accumulated debris, algae, and other buildup that may subsequently move through the drain line and cause another blockage. If Yates Maintenance must return after the initial cleaning solely to clear additional debris or algae buildup that has broken free, the discounted return drain-clearing fee is $89.00 plus applicable tax. This discounted fee applies only to that follow-up drain clearing; other repairs, additional work, or conditions unrelated to the original cleaning will be quoted and billed separately. Removal and reinstallation of an evaporator coil, if required, is additional work subject to approval.

13. Residential one-day installations

Unless the accepted proposal states otherwise, a 50% deposit is due at approval and to secure equipment and the remaining 50%, together with approved changes, is due on the same day the contracted installation is completed.

14. Residential service and repair payments

Approved diagnostic, parts, and labor charges are due on the day service is completed. Yates Maintenance does not bill.

15. Commercial, custom and new-construction payment schedules

Job-specific payment terms are established by Yates Maintenance when preparing the project proposal, based on project size, anticipated duration, specialized equipment and material commitments, and construction schedule. Yates determines deposits, equipment-ordering and securing payments, progress-payment amounts, construction draws, milestone definitions, retainage (if any), invoicing dates, and payment deadlines. Those terms become binding upon acceptance of the proposal. The residential 50%/50% same-day installation schedule does NOT apply to commercial, custom, and new construction proposals. Each completed phase or milestone may be invoiced bi-weekly when reached even if other trades or the overall building project remain incomplete. Additional mobilizations, owner- or contractor-caused delays, equipment storage, schedule changes, and approved change orders may be separately billed as provided in the agreement. Yates Maintenance may suspend future phases for overdue amounts after any required notice.

16. Punch-list payments

Documented punch-list or warranty items are addressed under the applicable agreement and do not automatically postpone payment for unrelated, undisputed completed work. The customer cannot automatically withhold a large balance due simply because that a minor item remains on order or unfinished on the customer's account or sheetrock or finishing schedule. The balance for completed, undisputed work remains due according to the agreement, and Yates Maintenance is still responsible for completing the documented punch-list item such as final grille installation.

17.Residential-only financing

Financing is available only for qualifying residential customers and eligible residential projects, subject to lender approval and financing terms. Financing is not available for commercial projects, commercial installations, or new-construction projects. Any residential financing arrangements, lender approvals, and disbursement requirements must be documented in the applicable financing agreement.

18. Commercial and new-construction card processing fee

Payments made by credit card for commercial installation or new-construction projects are subject to a 3% card processing fee, disclosed before payment and applied only where permitted by applicable law and payment-network rules. This fee does not apply to payments made by other accepted methods.

19. Card-on-file payment authorization

A valid credit/debit card may be required on file for service dispatch. Customer authorizes charges for approved work and disclosed fees in accordance with the payment authorization presented at booking or approval. If payment is not otherwise made at completion, Yates may charge the authorized card for the amount properly due, subject to payment-network rules and law.

20. Past-due balances and collection

An unpaid balance more than 48 hours after its due date is past due. Late fees, interest, collection costs, and attorneys' fees may be assessed only if separately disclosed and permitted by law; the exact late-fee schedule must be approved and inserted before publication. Yates may suspend non-emergency future work on delinquent accounts. Returned checks may incur a $25 charge to the extent permitted by law.

21. Cancellation, special orders, and equipment custody

If Customer cancels after approval, Customer remains responsible for completed work, properly incurred labor, and reasonable documented nonrecoverable material, restocking, delivery, and cancellation costs as allowed by law and the accepted proposal. Custom or nonreturnable equipment may require additional deposit terms disclosed before ordering. Equipment delivery, storage, custody, and risk of damage should be allocated in the project proposal based on actual control of the jobsite. Yates reserves lawful payment and lien remedies; a general statement that installed equipment remains Yates' property does not override real-property, secured-transactions, or lien law.

22. Site readiness and prerequisite work

Customer, builder, or general contractor must provide a reasonably ready, accessible, and safe site, with required framing, openings, electrical service, gas supply, drains, roofing, and other predecessor work completed as identified in the proposal.

23. Construction delays and remobilization

If other trades, owner decisions, inspections, unavailable utilities, or construction delays prevent planned work, Yates may adjust the schedule and propose reasonable documented additional costs for return trips, storage, standby, remobilization, or rework. Such charges require any approvals specified in the contract. Concealed damage, asbestos, mold, structural defects, noncompliant wiring, and other unforeseen conditions are excluded unless expressly included. Yates may stop work until unsafe conditions are corrected.

24. Damage by other trades; protection of completed work

Customer and controlling contractor must reasonably protect installed equipment, ductwork, refrigerant lines, drains, wiring, and accessories from damage, debris, painting, construction dust, tampering, or subsequent work. Yates will document completed stages with photographs when practical. Repairs made necessary by independently caused damage or alteration after Yates' work may be separately priced. Yates remains responsible for damage it causes to the extent required by law and contract.

25. Final walkthrough and completion sign-off

At substantial completion of the contracted installation, Customer or an authorized representative will have a reasonable opportunity to inspect reasonably visible portions of the work, review placement and appearance, and identify concerns for a written punch list. By signing the completion acknowledgment, Customer confirms an opportunity to inspect and accepts visible and reasonably observable installation details except specifically listed deficiencies. This is the appropriate time to raise visible aesthetic or preference concerns. We will not go back months later and perform any re-work after the installation work has been approved by customer and inspector.

26. Aesthetic changes after completion

Later requests to relocate equipment, change visible piping or registers, alter approved appearance, or modify otherwise conforming work because preferences have changed are additional billable work, even if requested 30 days or three months later. Acceptance does not waive claims for hidden defects, deficient workmanship, manufacturer warranties, code compliance, or nonwaivable rights. If Customer is unavailable, Yates may document the condition and offer a reasonable inspection opportunity.

27. Residential workmanship warranty

Unless the accepted proposal expressly provides a different term, Yates warrants its own covered installation or repair workmanship for 365 days from completion of that work. This covers correction of verified defects in Yates labor; it is not a promise that all equipment or components will operate without failure for 365 days.

28. Commercial service-repair workmanship warranty

Yates warrants its own covered repair workmanship for 30 days from completion of the specific repair, unless the accepted written proposal provides a different term. This limited workmanship warranty covers verified defects in the repair labor performed by Yates, not separate equipment failures, other components, or new problems unrelated to that repair.

29. New commercial installation workmanship warranty

Yates warrants its own covered installation workmanship for 365 days from completion of the applicable installation or documented project milestone, unless the accepted written project agreement expressly provides otherwise. This is separate from the 30-day commercial service-repair warranty.

30. New-construction warranty commencement

The accepted proposal shall identify the workmanship warranty start point for each phase or installed system. Delayed building completion, occupancy, or startup does not automatically extend an already-started workmanship period.

31. Manufacturer equipment and parts warranties

Equipment, parts, compressors, heat exchangers, and other components are covered only to the extent provided in the applicable manufacturer's written warranty, which varies by brand, model, equipment category, registration, and commercial versus residential application. Manufacturer coverage may exclude labor, refrigerant, shipping, crane service, access equipment, and diagnostics.

32. Covered workmanship callbacks

Yates will inspect and appropriately correct verified covered workmanship defects without charging for that correction. Other return visits may carry disclosed diagnostic, labor, or material charges. Damage caused by third parties, lack of maintenance which is required by manufacturer in order to keep equipment warranty valid, customer-supplied parts, and unrelated failures are not automatically Yates workmanship defects. No provision eliminates statutory rights or an express written warranty. Manufacturer coverage for any replacement part is determined separately by the applicable written warranty. Manufacturer coverage follows its own commencement and registration rules.

33. Equipment registration and delayed new-construction startup

Equipment registration, startup, and warranty eligibility depend on the actual manufacturer's written requirements and the equipment's application. The customer, owner, or builder is responsible for submitting and confirming timely registration. Yates assists with this registration as a courtesy, although it is not required. Required information is complete owner information, address, model/serial, installation, and occupancy information and must be supplied promptly. Residential registered extended warranties may differ from commercial standard warranties; some commercial equipment is ineligible for residential extended terms. Construction delays, delayed utility service, and delayed occupancy do not themselves extend manufacturer deadlines or warranty commencement. Yates will provide reasonably available equipment identification and startup documentation.

34. Right to inspect and proposed correction

Customers must provide Yates Maintenance with written notice of any alleged workmanship defect and a reasonable opportunity to inspect and, where appropriate, correct its own work before authorizing nonemergency corrective work by another contractor. This requirement does not prevent reasonable emergency measures necessary to protect persons or property or the exercise of rights that cannot legally be waived. Yates Maintenance will not be responsible for or reimburse the cost of third-party repairs, corrections, or modifications performed.

35. Existing components excluded from equipment estimates

Where Yates repairs or replaces only part of a system, existing ductwork, electrical supply, drains, insulation, controls, ventilation, and building-envelope conditions remain outside scope unless expressly included in the accepted estimate. The equipment or system replacement estimate does not include correction, repair, replacement, or modification of these existing components or conditions unless specifically itemized.

36. System performance and comfort limitations

System comfort, airflow, efficiency, humidity, energy costs, and longevity depend on factors outside Yates' control.

37. Unforeseen deficiencies and change orders

During installation, Yates may discover concealed or previously unidentified deficiencies, damage, improper installations, unsafe conditions, or code noncompliance affecting existing components or connections. If discovered, Yates will notify the Customer, explain and, where practical, document the findings, and offer a written change order describing the proposed corrective work and additional cost. Such corrective work is not included in the original equipment estimate and will not proceed without Customer authorization, except for immediate safety measures reasonably necessary to protect persons or property. If the Customer declines work necessary for safe, compliant, or proper operation, Yates may suspend the affected work until the issue is resolved. Any resulting additional labor, materials, return trips, or schedule changes will be addressed in the proposed change order.

38. Safety, code compliance, and Yates workmanship

Nothing in these Terms permits Yates to knowingly leave its own work unsafe or noncompliant with applicable requirements, or to charge separately for correcting Yates' own defective workmanship or work already expressly included in the approved scope.

39. Permits, inspections, and scope responsibilities

The accepted scope determines responsibility for permits, inspection fees, equipment startup, controls integration, crane/lift work, roof or structural modifications, electrical upgrades, gas work, and third-party testing. Customers must be available onsite for a specific day or window of time for inspections where required by jurisdictions. Any re-inspection fees due to customer not being available will be the responsibility of the customer.

40. Independent testing, adjusting, and balancing (TAB)

When testing, adjusting, and balancing (TAB) is required by project plans, specifications, applicable codes, or other project requirements, Yates Maintenance will source and coordinate a qualified independent third-party TAB contractor to perform those services. TAB is separate from Yates equipment startup and operational verification. The third-party TAB cost will be billed to the Customer in addition to the equipment and installation estimate unless TAB is expressly included as a priced item in the accepted proposal. Yates will disclose the anticipated TAB cost and obtain Customer approval before authorizing the third-party service. Additional testing, repeat TAB visits, and corrective work outside the approved scope may require a separate approved change order. Yates remains responsible for correcting deficiencies caused by its own defective workmanship as required by the applicable agreement and warranty.

41. Additional commercial exclusions and reinspections

Unless expressly included, independent commissioning, fire alarm/building automation integration, and third-party engineering are excluded from Yates' price. Reinspection charges caused by inaccessible sites or failures outside Yates' responsibility may be billable to the customer.

42. Property damage, finishes, and repair process

Normal access openings, penetrations, and removal of existing equipment may affect drywall, paint, trim, flooring, landscaping, roofing, and cosmetic finishes. Cosmetic matching and finishing work are excluded, except to the extent Yates is legally responsible for damage caused by its own improper performance. Customer should report alleged damage promptly and allow Yates a reasonable opportunity to inspect. For verified Yates-caused damage, Yates may arrange a qualified repair provider, subject to applicable law and reasonable coordination. Photographs and signed completion records may be used to document existing and completed conditions. Yates will not go back weeks or months later to repair what a customer finds cosmetically unsatisfactory. It is the responsibility of the customer to approve our installation and deem it satisfactory on the day of the installation.

43. Technician safety and work stoppage

Yates personnel follow applicable safety procedures and may decline, suspend, or reschedule work due to unsafe electrical or mechanical conditions, severe weather, aggressive animals, infestation, hazardous materials, unstable structures, blocked access, or threats to personnel. Customer is responsible for correcting hazards under their control. Yates will communicate known safety issues and any required revised scope or charges.

44. Maintenance-plan term and system coverage

A preventive maintenance plan covers the identified system and location for a 12-month term, renewing annually unless canceled as provided in the plan. Monthly billing is a payment method for the annual plan, not a month-to-month maintenance entitlement unless the signed plan states otherwise. The standard plan includes one professional maintenance visit per covered system per annual term. Any different tier, additional visit, or discount must appear in the purchased plan schedule. A separate plan is required for each covered system.

45. Maintenance-plan covered services and exclusions

Visits are limited to listed inspection/cleaning tasks appropriate to the system type and safe access; no repair, replacement part, refrigerant, special testing, or additional visit is included unless expressly stated in the plan.

46. Maintenance scheduling and unused visits

Customer must contact Yates at 501-960-8971 to schedule the included maintenance visit within the applicable annual term. Reminders are courtesy notices, not a substitute for Customer scheduling. Unused visits do not carry over or become retroactive, except as required by law or separately agreed in writing.

47. Maintenance weather, access, and safety requirements

Maintenance is performed during regular business hours. Air-conditioning maintenance requires appropriate weather, ordinarily outdoor temperature above 60°F and no forecast inclement weather. Systems must be safe, accessible, code-compliant, and suitable for maintenance. Yates may propose additional diagnostic, cleaning, or repair services for approval. Any plan discount is limited to the purchased tier and published exclusions.

48. Maintenance-plan billing and annual renewal

Plan price, taxes, monthly/annual payment method, effective date, renewal date, included visits, and discounts are specified in the plan enrollment or invoice. Plans automatically renew for successive 12-month terms unless canceled in accordance with the written plan terms and applicable renewal-notice laws.

49. Maintenance-plan cancellation and refunds

Customer may request cancellation by calling the office or using any cancellation method required by law. If cancellation occurs after an included service has been performed, any remaining amount due for that annual service benefit may be collected only as clearly disclosed at enrollment and permitted by law; no undisclosed penalty applies. If one of two visits has been performed, half of the plan amount is due and non refundable. If no service has occurred, unearned prepaid amounts and any refunds are handled under the plan terms. Yates may cancel for material misrepresentation, nonpayment, unsafe access, or discontinuation of the plan with required notice. Moving does not automatically transfer coverage to a new address, or to a different customer.

50. Dispute resolution

The parties will first attempt in good faith to resolve a written dispute through direct communication.

51. Other legal remedies and liability provisions

Any mediation, arbitration, jury/class-action waiver, limitation of liability, damages exclusion, prevailing-party fee provision, or venue selection must be contained in a separately approved, conspicuous provision appropriate to residential consumers and commercial customers and consistent with applicable law. Unless an applicable signed project agreement expressly provides otherwise, the parties retain the remedies and procedures provided by applicable law.

52. Liens and statutory property-owner notice

Yates reserves mechanics' and construction lien rights and other lawful remedies for unpaid work, subject to applicable Arkansas notice, delivery, timing, and filing requirements. The separately supplied 'NOTICE TO PROPERTY' OWNER provided by Yates' counsel is retained as a separate notice and acknowledgment form, with its existing wording unchanged. Yates will retain signed notices and proof of delivery in the project record.

53. Force majeure and construction delays

Neither party is responsible for delay caused by events beyond reasonable control, such as severe weather, natural disasters, government orders, power failures, and material shortages, except that amounts already due remain payable. The affected party will provide reasonable notice and take reasonable steps to mitigate delay.

54. Notices and general provisions

Contract notices may be delivered to the contacts provided, subject to any legally required delivery method. If a provision is unenforceable, the remaining provisions remain effective. Arkansas law governs work performed in Arkansas unless another applicable law controls. These Terms apply prospectively to agreements incorporating this version.

55. Customer acceptance and completion acknowledgment

By signing the proposal or otherwise approving work through an authorized electronic process, Customer acknowledges receipt of these Terms, the applicable scope and price, and any separately presented payment authorization. For installation completion, a separate dated sign-off should identify the project, equipment, completion date, photographs, walkthrough opportunity, punch-list exceptions, and signatures. The completion sign-off confirms visible acceptance only as described in Section 14 and does not waive protected warranty or statutory rights.